Optimal scheduling of the 3-machine assembly-type flow shop
RAIRO - Operations Research - Recherche Opérationnelle, Tome 33 (1999) no. 4, pp. 439-445.
@article{RO_1999__33_4_439_0,
     author = {Haouari, Mohamed and Daouas, Thouraya},
     title = {Optimal scheduling of the $3$-machine assembly-type flow shop},
     journal = {RAIRO - Operations Research - Recherche Op\'erationnelle},
     pages = {439--445},
     publisher = {EDP-Sciences},
     volume = {33},
     number = {4},
     year = {1999},
     mrnumber = {1735447},
     zbl = {0961.90033},
     language = {en},
     url = {http://archive.numdam.org/item/RO_1999__33_4_439_0/}
}
TY  - JOUR
AU  - Haouari, Mohamed
AU  - Daouas, Thouraya
TI  - Optimal scheduling of the $3$-machine assembly-type flow shop
JO  - RAIRO - Operations Research - Recherche Opérationnelle
PY  - 1999
SP  - 439
EP  - 445
VL  - 33
IS  - 4
PB  - EDP-Sciences
UR  - http://archive.numdam.org/item/RO_1999__33_4_439_0/
LA  - en
ID  - RO_1999__33_4_439_0
ER  - 
%0 Journal Article
%A Haouari, Mohamed
%A Daouas, Thouraya
%T Optimal scheduling of the $3$-machine assembly-type flow shop
%J RAIRO - Operations Research - Recherche Opérationnelle
%D 1999
%P 439-445
%V 33
%N 4
%I EDP-Sciences
%U http://archive.numdam.org/item/RO_1999__33_4_439_0/
%G en
%F RO_1999__33_4_439_0
Haouari, Mohamed; Daouas, Thouraya. Optimal scheduling of the $3$-machine assembly-type flow shop. RAIRO - Operations Research - Recherche Opérationnelle, Tome 33 (1999) no. 4, pp. 439-445. http://archive.numdam.org/item/RO_1999__33_4_439_0/

J. Carlier and I. Rebaï, Two Branch and Bound algorithms for the Permutation Flow Shop Problem, European J. Oper. Res., 1996, 90, n° 2, p. 238-251. | Zbl

M. Haouari and R. M'Hallah, A Heuristic for the Two-Stage Hybrid flow Shop Problem, Oper. Res. Lett., 1997, 21, n° 1, p. 43-53. | MR | Zbl

S. M. Johnson, Optimal Two and Three-Stage Production Schedule with Setup Times Included, Naval Res. Logist. Quart., 1954, 1, p. 61-68.

Gotha, Les problèmes d'ordonnancement, RAIRO-Oper. Res., 1993, 27, p. 77-150. | EuDML | Numdam | MR | Zbl

E. L. Lawler, J. K. Lenstra, A. H. G. Rinnooy Kan and D. B. Shmoys, Sequencing and Scheduling: Algorithms and Complexity, in: Operations Research and Management Science, Vol.4: Logistics of Production and Inventory, North-Holland, Amsterdam, 1993, p. 445-522.

C. Y. Lee, T. C. E. Cheng and B. M. T. Lin, Minimizing the makespan in the 3-Machine Assembly-Type Flowshop Scheduling Problem, Management Sci., 1993, 39, p. 616-625. | Zbl

C. Oguz and T. C. E. Cheng, Two-stage Flowshop Scheduling with a Common Second-Stage Machine, INFORMS Meeting, Los Angeles, May 1995. | Zbl

C. N. Potts, S. V. Sevast-Janov, V. A. Strusevich, L. N. Van Wassenhove and C. M. Zwanevald, The Two-Stage Assembly Scheduling Problem: Complexity and Approximation, Oper. Res., 1995, 43, p. 346-355. | MR | Zbl