This research work derives an integrated inventory model for imperfect production/remanufacturing process with time varying demand, production and repair rates under inflationary environment. This inventory model deals with the joint manufacturing and remanufacturing options. There is a collection process devoted to collect used items with the aim to remanufacture them. Both production and repair runs generate imperfect items. The repair process remanufactures used and imperfect items. Further, it is also considered that the remanufactured item that is classified as good has exactly same quality as that of new one. Demand rate is supposed as time dependent. The production rate is assumed to be demand dependent and therefore it is also time dependent. The repair rate is supposed to be a function of time. All system costs are contemplated in uncertain environment. Therefore, the costs are considered as fuzzy nature. Theoretical results are illustrated thru a numerical example. Finally, a sensitivity analysis is performed in order to know the impact of different parameters on the optimal policy.
Accepté le :
DOI : 10.1051/ro/2017070
Mots-clés : Imperfect production, time dependent demand, production and repair rates, reverse logistics, inflation, fuzzy costs
@article{RO_2018__52_1_217_0, author = {Jain, Shalini and Tiwari, Sunil and C\'ardenas-Barr\'on, Leopoldo Eduardo and Shaikh, Ali Akbar and Singh, Shiv Raj}, title = {A fuzzy imperfect production and repair inventory model with time dependent demand, production and repair rates under inflationary conditions}, journal = {RAIRO - Operations Research - Recherche Op\'erationnelle}, pages = {217--239}, publisher = {EDP-Sciences}, volume = {52}, number = {1}, year = {2018}, doi = {10.1051/ro/2017070}, mrnumber = {3812478}, zbl = {1397.90022}, language = {en}, url = {http://archive.numdam.org/articles/10.1051/ro/2017070/} }
TY - JOUR AU - Jain, Shalini AU - Tiwari, Sunil AU - Cárdenas-Barrón, Leopoldo Eduardo AU - Shaikh, Ali Akbar AU - Singh, Shiv Raj TI - A fuzzy imperfect production and repair inventory model with time dependent demand, production and repair rates under inflationary conditions JO - RAIRO - Operations Research - Recherche Opérationnelle PY - 2018 SP - 217 EP - 239 VL - 52 IS - 1 PB - EDP-Sciences UR - http://archive.numdam.org/articles/10.1051/ro/2017070/ DO - 10.1051/ro/2017070 LA - en ID - RO_2018__52_1_217_0 ER -
%0 Journal Article %A Jain, Shalini %A Tiwari, Sunil %A Cárdenas-Barrón, Leopoldo Eduardo %A Shaikh, Ali Akbar %A Singh, Shiv Raj %T A fuzzy imperfect production and repair inventory model with time dependent demand, production and repair rates under inflationary conditions %J RAIRO - Operations Research - Recherche Opérationnelle %D 2018 %P 217-239 %V 52 %N 1 %I EDP-Sciences %U http://archive.numdam.org/articles/10.1051/ro/2017070/ %R 10.1051/ro/2017070 %G en %F RO_2018__52_1_217_0
Jain, Shalini; Tiwari, Sunil; Cárdenas-Barrón, Leopoldo Eduardo; Shaikh, Ali Akbar; Singh, Shiv Raj. A fuzzy imperfect production and repair inventory model with time dependent demand, production and repair rates under inflationary conditions. RAIRO - Operations Research - Recherche Opérationnelle, Tome 52 (2018) no. 1, pp. 217-239. doi : 10.1051/ro/2017070. http://archive.numdam.org/articles/10.1051/ro/2017070/
[1] Theory and methodology on the global optimal solution to a general reverse logistics inventory model for deteriorating items and time-varying rates. Comput. Ind. Eng. 60 (2011) 236–247. | DOI
,[2] Optimal manufacturing batch size with rework for a finite-horizon time-varying demand rates inventory model. RAIRO: OR 51 (2017) 173–187. | DOI | Numdam | MR | Zbl
and ,[3] Easy and improved algorithms to joint determination of the replenishment lot size and number of shipments for an EPQ model with rework. Math. Comput. Appl. 18 (2016) 132–138. | Zbl
, and ,[4] An application of fuzzy sets theory to the EOQ model with imperfect quality items. Comput. Oper. Res. 31 (2004) 2079–2092. | DOI | MR | Zbl
,[5] Green-component life-cycle value on design and reverse manufacturing in semi-closed supply chain. Int. J. Prod. Econ. 113 (2008) 528–545. | DOI
and ,[6] Short life-cycle deteriorating product remanufacturing in a green supply chain inventory control system. Int. J. Prod. Econ. 129 (2011) 195–203. | DOI
and ,[7] A production/recycling model with stationary demand and return rates. Cent. Eur. J. Oper. Res. 11 (2003) 35–46. | MR | Zbl
and ,[8] An extended production/recycling model with stationary demand and return rates. Int. J. Prod. Econ. 90 (2004) 311–323. | DOI
and ,[9] A production/recycling model with quality considerations. Int. J. Prod. Econ. 104 (2006) 571–579. | DOI
and ,[10] A production/remanufacturing inventory model with price and quality dependent return rate. Comput. Ind. Eng. 58 (2010) 352–362. | DOI
, and ,[11] An inventory control model with consideration of remanufacturing and product life cycle. Int. J. Prod. Econ. 133 (2011) 645–652. | DOI
,[12] https://en.wikipedia.org/wiki/Reverse_logistics.
[13] Lot sizing in a production system with rework and product deterioration. Int. J. Prod. Res. 43 (2005) 1355–1374. | DOI | Zbl
, and ,[14] The production, remanufacture and waste disposal model with lost sales. Int. J. Prod. Econ. 120 (2009) 115–124. | DOI
and[15] An economic production and remanufacturing model with learning effects. Int. J. Prod. Econ. 131 (2011) 115–127. | DOI
and[16] The economic order quantity repair and waste disposal model with entropy cost. Eur. J. Oper. Res. 188 (2008) 109–120. | DOI | Zbl
and ,[17] Introduction to Fuzzy Arithmetic: Theory and Applications. Van Nostrand Reinhold, New York (1991). | Zbl
and ,[18] Multi-stage cleaner production process with quality improvement and lead time dependent ordering cost. J. Clean. Prod. 144 (2017) 572–590. | DOI
and ,[19] Integrating a Web-Based System With Business Processes in Closed Loop Supply Chains. [Electronic version], Econometric Institute Report Series, EI2001-31, Erasmus University, Rotterdam (2001) 1–30.
, , , and ,[20] Lot-sizing for a single-product recovery system with backordering. Int. J. Prod. Res. 44 (2004) 2031–2045. | DOI | Zbl
and ,[21] Optimal policy and holding cost stability regions in a periodic review inventory system with manufacturing and remanufacturing options. Eur. J. Oper. Res. 178 (2007) 433–448. | DOI | Zbl
and ,[22] A note on: developing an exact solution for an inventory system with product recovery. Int. J. Prod. Econ. 111 (2008) 707–712. | DOI
and ,[23] Note on: an optimal ordering and recovery policy for reusable items. Comput. Ind. Eng. 55 (2008) 729–734. | DOI
, and ,[24] Lot sizing for a single product recovery system with variable setup numbers. Eur. J. Oper. Res. 203 (2010) 326–335. | DOI | Zbl
and ,[25] Lot sizing for a recoverable product with inspection and sorting. Comput. Ind. Eng. 58 (2010) 452–462. | DOI
, and ,[26] Deterministic model for a repairable inventory system with a finite repair rate. Int. J. Prod. Res. 17 (1979) 215–221. | DOI
, ,[27] A model for a production-repair system under a time-varying demand process. Int. J. Prod. Econ. 119 (2009) 17–23. | DOI
, ,[28] A production and repair model under a time-varying demand process. Bull. Malay. Math. Sci. Soc. 35 (2012) 85–100. | MR | Zbl
, ,[29] The EOQ repair and waste disposal model with variable setup numbers. Eur. J. Oper. Res. 95 (1996) 313–324. | DOI | Zbl
,[30] The extended EOQ repair and waste disposal model. Int. J. Prod. Econ.45 (1996), 443–447. | DOI
,[31] Pure and mixed strategies for the EOQ repair and waste disposal problem. OR Spectr. 19 (1997) 123–129. | DOI | MR | Zbl
,[32] Going Backwards: Reverse Logistics Trends and Practices. Reverse Logistics Executive Council (1998).
and ,[33] Periodic review fuzzy inventory model with variable lead time and fuzzy demand. To appear in: Int. Trans. Oper. Res. DOI: (2015). | DOI | MR
and ,[34] Improved quality, setup cost reduction, and variable backorder costs in an imperfect production process. Int. J. Prod. Econ. 155 (2014) 204–213. | DOI
and ,[35] Product inspection policy for an imperfect production system with inspection errors and warranty cost. Eur. J. Oper. Res. 248 (2016) 263–271. | DOI | Zbl
and ,[36] An economic production quantity model with random defective rate, rework process and backorders for a single stage production system. J. Manuf. Syst. 33 (2014) 423–435. | DOI
, , and ,[37] A deterministic inventory model for repairable items. Nav. Res. Logist. Q. 14 (1967) 391–398. | DOI
,[38] A closed loop supply chainsystem with flexible manufacturing and reverse logistics operationunder shortagesfor deteriorating items. Procedia Technol. 10 (2013) 330–339. | DOI
and ,[39] A hybrid method of Pareto, TOPSIS and genetic algorithm to optimize multi-product multi-constraint inventory control systems with random fuzzy replenishments. Math. Comput. Model. 49 (2009) 1044–1057. | DOI | MR | Zbl
, , and ,[40] Economic production quantity model with scrapped items and limited production capacity. Sci. Iran. Trans. E Ind. Eng. 17 (2010) 58–69.
, and ,[41] Meta-heuristic algorithms for solving a fuzzy single-period problem. Math. Comput. Model. 54 (2011) 1273–1285. | DOI | MR | Zbl
, and ,[42] Replenish-up-to multi-chance-constraint inventory control system under fuzzy random lost-sale and backordered quantities. Knowl.-Based Syst. 53 (2013) 147–156. | DOI
, , ,[43] A deterministic multi product single machine EPQ model with backordering, scraped products, rework and interruption in manufacturing process. Int. J. Prod. Econ. 150 (2014) 9–27. | DOI
, and ,[44] Optimal batch quantity in a cleaner multi-stage lean production system with random defective rate. J. Clean. Prod. 139 (2016) 922–934. | DOI
and ,[45] Ranking fuzzy numbers based on decomposition principle and signed distance. Fuzzy Sets Syst. 116 (2000) 275–288. | DOI | MR | Zbl
and ,Cité par Sources :